Skip to main content

GOC was contracted by the General Directorate of Roads to draw up the construction project for the new section of the Duero Highway (A11): the Aranda de Duero bypass.

In addition to the drafting of the basic and execution project, GOC carried out the following activities:

  • Layout study
  • Geotechnical study
  • Environmental control and monitoring and acoustic studies and tests
  • Structural design and calculation engineering

Leave a Reply

G.O.C.,S.A,
Av/Doctor Canoa 5
Copyright 2023