G.O.C. will supervise the construction of Alcaņiz Hospital (Spain)

The Joint Venture NUEVO HOSPITAL DE ALCAŅIZ (OHL and DRAGADOS), has hired G.O.C. to supervise the construction works. The activities to be carried out within the contract are: documentary control and reception of products; supervision and control of work execution; control of the finished work; and technical assistance as a quality control entity.

Alcaņiz hospital will have 157 hospital beds and will have the areas of oncology, radiodiagnosis, hemodialysis, ICU, extractions and rehabilitation . In addition, it will have 62 outpatient clinics in the central block, six operating theaters and four delivery rooms in the obstetric area. It will also have more than 600 parking spaces: 120 on the surface and 488 underground.
 
The construction value will be around 60 million euros and the construction works will last 52 months.