Energy Optimization Plan. Sevilla Airport
 
Client
AENA (Aeropuertos Españoles y Navegación Aérea)
Timeframe
1998


WORK DESCRIPTION

Technical and economic feasibility study on economy and resource integration measures, divided into the following parts:
  • Analysis of the building and facilities current state, including inventory of major energy consumers.
  • Analysis of electric energy and water used in the immediate past and present.
  • Analysis of the expected future situation.
  • Analysis of available resources, from the standpoint of energy, both acquired as renewables.
  • Study of alternatives to the current situation grouped into the following sections:
    • Saving
    • Replacing of acquired energies
    • Cogeneration
    • Renewables