Prison in San Bartolome de Tirajana, Las Palmas de Gran Canaria
 
Client
SIEP. Sociedad de Infraestructuras y Equipamientos Penitenciarios
Budget execution
72,5 million
Timeframe
2007-2010


PROJECT DESCRIPTION

The Canary II prison has a capacity of 1008 cells and 206 additional (12 cellblocks of 72 cells and 4 of 36 cells); the distribution of the structure is:
  • 12 residential cellblocks with 72 cells.
  • 4 multi-residential cellblocks with 36 cells.
  • A segregation unit with 50 cells.
  • An Admission, Dismissal and Transit Unit with 72 cells.
  • A healthcare facility with a total of 64 beds
G.O.C. ACTION

Drawing up the execution project.