Highway from Levante to France through Aragon. Stretch: María de Huerva - Zaragoza (4th bypass)
 
Client
Ministerio de Fomento. Dirección General de Carreteras
Budget execution
€ 36,8 million
Timeframe
2002-2005


PROJECT DESCRIPTION
New highway for the Teruel –Zaragoza corridor. Construction of two junctions and 30 structures, 6 intersections, duplication of 2 stretches, drainage improvement and pavement strengthening and signalling.
Construction of junctions (Cadrete, a trumpet type, and Cuarte de Huerva, a grade-separated roundabout), linking bridges, over and under passes, one of which is a cantilevered structure over the Teruel-Zaragoza railway.
G.O.C. ACTION
With a team of fifteen people, G.O.C. performed the functions of  Work Management until the entry into service.