A-45 Malaga highway. Stretch: Aguilar de la Frontera-Lucena
 
Client
Ministerio de Fomento. Dirección General de Carreteras
Budget execution
€27,8 million
Timeframe
2002-2004

PROJECT DESCRIPTION
 
This stretch of the Malaga highway, Aguilar de la Frontera-Lucena runs through the towns of Aguilar de la Frontera, Monturque and Lucena, with a total length of 9,800 m (all as a bypass) and a project speed of 120km / h.

8 structures were built, 3 overpasses, 2 underpasses, and 3 viaducts (2 trunk viaducts and the third as a service road) to bridge over the natural unevenness of the ground or to connect secondary roads or service roads with the highway.

Besides works of signaling, beaconing and defense, there were projected complementary works:
  • Enclosure on both sides of the highway and branches.
  • SOS and optical fiber networks.


G.O.C. ACTIONS

With a team of fifteen people, G.O.C. performed the functions of Work Management until the entry into service.